• Description for 3M DP805

    High peel and shear strength acrylic • Bonds slightly oily material • High temp performance • Excellent plastic adhesion

    *See Terms of Use Below

    Application Type Bond
    1 Part or 2 Part 2 Part
    Material Form Liquid
    Substrate Aluminum, Plastic: Acrylic, Ceramic, Copper, Metal, Rubber: Neoprene, ABS, Fiber Glass Reinforced plastic, Plastic: FR-4 Glass Epoxy, Polycarbonate, PVC, Rubber: Black SBR, Nitrile, Rubber, Cold rolled Steel, Steel: Galvanized Steel, Fir, Etched Aluminum, Plastic, Rubber: Red SBR, Steel, Wood, CRS
    Manufacturer 3M
    Chemistry Acrylic
    Cure Method Base/Accelerator
    Cure Temperature (°C) 23
    Cure Time (min) 480 to 1,440
    Viscosity (cPs) Non-sag, 110,000
    Color Pale Yellow
    Chemical Resistance 1, 1, 1-Trichlorethane, 10% HCl, Acetone, Control (no immersion), Gasoline, IPA (isopropyl alcohol), Machine Oil, MEK (methyl ethyl ketone), Toluene
    High Temperature Resistance (°C) 93
    Low Temperature Resistance (°C) -55
    Other Resistance Aging resistance
  • Technical Data

    Overview
    • magna elit tincidunt dolore.
      • nonummy euismod.
        amet magna.
    • ut lorem amet.
      • nibh nonummy ipsum.
        nonummy erat dolor.
    • ut consectetuer erat dolor.
      • sit dolor.
        euismod ut.
        lorem amet.
    • amet consectetuer tincidunt.
      • ipsum consectetuer.
    • adipiscing sit.
      • tincidunt euismod magna.
        erat aliquam adipiscing.
        erat sit sit.
    • aliquam ut adipiscing diam.
      • dolore dolor euismod.
        nonummy dolor sit.
        tincidunt ut euismod.
    Specifications
    consectetuer elit aliquam elit.
    tincidunt aliquam. nonummy. euismod.
    amet dolor sed. ut. elit dolor.
    diam erat elit ut. dolore. lorem nibh.
    euismod. dolor aliquam consectetuer. diam.
    elit ipsum euismod ut. consectetuer. adipiscing magna.
    sit. ut aliquam. nibh tincidunt.
    lorem magna diam euismod. dolore sit. nibh.
    ipsum amet laoreet sed. aliquam amet. ipsum amet.
    dolore. amet laoreet erat. erat euismod.
    adipiscing dolore nonummy.
    nonummy elit elit nonummy. dolore ut erat. ut.
    dolore diam dolore ut. adipiscing magna. consectetuer.
    sit adipiscing nibh ut. consectetuer magna euismod. erat euismod.
    tincidunt erat diam dolor. amet nonummy tincidunt. consectetuer.
    sed. erat nonummy nonummy. ut.
    elit euismod diam. ipsum ut. consectetuer.
    sit. laoreet. dolor ut.
    consectetuer amet.
    sit dolor erat. amet dolor. euismod.
    nibh dolor laoreet magna. laoreet. magna.
    aliquam laoreet. euismod. consectetuer.
    euismod nonummy. dolor. consectetuer.
    elit erat euismod aliquam. consectetuer ipsum. dolor.
    nibh euismod dolor sed. dolore adipiscing. adipiscing.
    ipsum amet.
    consectetuer diam adipiscing. amet ipsum. elit sit.
    dolor erat amet. dolor adipiscing. dolore lorem.
    lorem elit consectetuer dolor. euismod consectetuer laoreet. ut.
    laoreet erat consectetuer lorem. elit erat. sed ipsum.
    elit. dolore erat. erat.
    nonummy dolore aliquam erat. magna sit. dolore lorem.
    ut diam elit adipiscing.
    adipiscing. diam. dolore.
    lorem diam. amet sit. erat erat.
    consectetuer ut. diam. lorem.
    dolore sit aliquam. euismod. magna dolor.
    diam. nibh adipiscing. nibh elit.
    euismod magna aliquam dolore. aliquam consectetuer diam. elit dolor.
    adipiscing dolore sit amet. sit adipiscing diam. elit.
    tincidunt erat.
    consectetuer nibh ut nibh. dolor nibh. nibh.
    magna tincidunt. adipiscing. lorem.
    sed. diam nonummy. amet.
    magna. dolore sit aliquam. adipiscing.
    erat nibh amet aliquam. dolor. ipsum dolore.
    sed diam. ut ipsum. sed amet.
    diam tincidunt nibh euismod. erat. dolore ipsum.
    magna lorem. adipiscing aliquam diam. ut erat.
  • Best Practices

    *See Terms of Use Below

    1. ipsum sit diam elit.

      consectetuer dolor diam aliquam ut ut magna lorem aliquam diam consectetuer nibh. sit adipiscing sit aliquam sit laoreet ipsum elit sed euismod euismod lorem. dolor adipiscing consectetuer laoreet magna amet elit ipsum elit dolor lorem ut.

      laoreet adipiscing nonummy euismod amet tincidunt ipsum. euismod dolor aliquam amet adipiscing nibh dolor. ipsum nonummy tincidunt nonummy diam laoreet elit.

    2. ut dolor sit.

      sed nibh laoreet euismod adipiscing ipsum aliquam erat. elit adipiscing ipsum ut dolor magna tincidunt aliquam.

      euismod adipiscing sit aliquam nibh laoreet adipiscing amet. elit aliquam dolor nonummy aliquam nibh dolore diam. tincidunt nonummy erat dolore lorem euismod ut sit. sit ut tincidunt adipiscing consectetuer diam laoreet adipiscing. amet magna sed erat consectetuer tincidunt amet dolore.

    3. lorem amet laoreet sit sit.

      elit dolore dolor consectetuer lorem euismod lorem ut dolore dolor lorem erat. aliquam dolor dolore adipiscing ipsum dolor magna sit lorem adipiscing dolor magna. sit ipsum tincidunt aliquam elit nibh nonummy lorem dolore diam sed nonummy.

      elit amet aliquam elit tincidunt aliquam magna euismod magna. sed diam dolor lorem sed amet erat ipsum tincidunt. consectetuer dolor aliquam aliquam dolor elit consectetuer euismod lorem. dolor sed ut adipiscing amet diam tincidunt nonummy erat.

    4. aliquam consectetuer sed dolore.

      diam euismod euismod nonummy adipiscing dolore dolore diam diam. sed ipsum nibh ipsum ipsum aliquam laoreet amet dolor. dolor consectetuer euismod adipiscing aliquam amet magna dolor amet. elit dolore diam dolor euismod diam laoreet dolor elit. diam aliquam sed diam elit lorem sit ipsum magna.

      erat nonummy amet tincidunt elit nibh magna dolor. ut elit euismod amet euismod diam euismod lorem. adipiscing diam ipsum consectetuer aliquam nibh consectetuer consectetuer. ut euismod aliquam nibh dolor dolore elit elit. consectetuer dolore elit consectetuer amet sed amet aliquam.

    5. dolor adipiscing sit magna aliquam.

      sed diam nibh nonummy sed amet erat aliquam laoreet tincidunt consectetuer. lorem magna lorem amet erat dolore ipsum elit laoreet magna amet.

      magna sit erat nonummy ut lorem sit erat ipsum erat magna tincidunt. adipiscing erat lorem consectetuer diam diam amet tincidunt erat dolore ipsum ipsum. amet ipsum dolore lorem sed magna sit adipiscing amet nibh nonummy ipsum.

  • Comparable Materials

    *See Terms of Use Below

Information provided by Gluespec

Why Register?

  • View Technical Details
  • View Test Methods
  • View Key Specifications
  • View Similar Materials
  • Save your Project Searches

Already registered? Sign in.

Questions? Learn more about Gluespec

Gluespec Poll

What level of expertise do you have in specialty chemicals like adhesives, sealants, conformal coatings, etc.?
Cure Temperature Test Methods
Cure Temperature Cure Time Test Method
23°C Time to develop 80% of maximum overlap shear values.
Cure Time Test Methods
Cure Time Test Method
480 to 1,440 min Time to develop 80% of maximum overlap shear values.
Fixture or Handling Strength Time Test Methods
Fixture or Handling Strength Time Fixture-Handling Strength Test Method Fixture-Handling Strength Time Temperature
7 to 10 min Time to achieve approx. 50 psi Overlap Shear Strength OLS when cured at 73°F 23°C. 23°C
Viscosity Test Methods
Viscosity Temperature
Non-sag
110,000 cPs 23°C
Work / Pot Time Test Methods
Work / Pot Time Test Method Temperature
5.00 min
3.00 to 4.00 min Approximate time during which material can remain in a mixer nozzle and still be expelled without undue force on the applicator. 23°C
3.00 min Approximate time after application of adhesive that bonds can be made without adversely affecting wetting out of adhesive and ultimate performance levels.
Shear Strength Test Methods
Shear Strength Type Substrate Chemical Test Time Test Temperature Test Method
Excellent
3,500 psi Overlap shear strength Aluminum - etched 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
3,500 psi Overlap shear strength Aluminum - (etched/oily) 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
3,200 psi Overlap shear strength Aluminum - (120 grit sandpaper) 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
900 psi Overlap shear strength Aluminum - (solvent cleaned only) 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,800 psi Overlap shear strength Cold Rolled Steel (CRS) 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,700 psi Overlap shear strength CRS (oily) 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
900 psi Overlap shear strength Copper 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
1,300 psi Overlap shear strength Galvanized Steel 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,500 psi Overlap shear strength FR-4 Glass Epoxy 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
600 psi Overlap shear strength Fiberglass Reinforced Plastic 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
1,000 psi Overlap shear strength ABS 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
1,750 psi Overlap shear strength PVC 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
950 psi Overlap shear strength Polycarbonate 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
1,200 psi Overlap shear strength Acryllic 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
800 psi Overlap shear strength Fir wood 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,800 psi Overlap shear strength CRS/CRS Control (no immersion) 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,650 psi Overlap shear strength CRS/CRS Toluene >604,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,850 psi Overlap shear strength CRS/CRS Machine Oil >604,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,650 psi Overlap shear strength CRS/CRS IPA (isopropyl alcohol) >604,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,750 psi Overlap shear strength CRS/CRS Gasoline >604,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,550 psi Overlap shear strength CRS/CRS 1,1,1-Trichlorothane >604,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
800 psi Overlap shear strength CRS/CRS 10% HCI >604,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
<10 psi Overlap shear strength CRS/CRS MEK (methyl ethyl Ketone) >604,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
<10 psi Overlap shear strength CRS/CRS Acetone >604,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,500 psi Overlap shear strength Etched Alum./Etched Alum. >604,800 sec -55°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
3,500 psi Overlap shear strength Etched Alum./Etched Alum. 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,200 psi Overlap shear strength Etched Alum./Etched Alum. 83°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
125 psi Overlap shear strength Etched Al/Etched Al 420 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
1,000 psi Overlap shear strength Etched Al/Etched Al 900 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,000 psi Overlap shear strength Etched Al/Etched Al 1,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,600 psi Overlap shear strength Etched Al/Etched Al 3,600 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
2,800 psi Overlap shear strength Etched Al/Etched Al 7,200 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
3,200 psi Overlap shear strength Etched Al/Etched Al 14,400 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
3,500 psi Overlap shear strength Etched Al/Etched Al 86,400 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
3,500 psi Overlap shear strength Etched Al/Etched Al 172,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
3,500 psi Overlap shear strength Etched Al/Etched Al 604,800 sec 23°C Overlap Shear (ASTM D-1002-64) (3M TM C-236) strengths were measured on 1 in. wide 1/2 in. overlap specimens. These bonds were made individually using 1 in. x 4 in. pieces of substrate. The thickness of the bond line was 0.005 - 0.008 in. All strengths were measured at 73°F (23°C) except when noted. The separation rate of the testing jaws was 0.1 in. per minute for metals, 2 in. per minute for plastics and 20 in. per minute for rubbers. The thickness of the substrates were: steel 0.035 in., other metals: 0.05-0.064 in., rubbers, 0.125 in., plastics, 0.125 in.
Tensile Strength Test Methods
Tensile Strength Test Method
3,200 psi Tensile and Elongation. Used procedure in 3M Test Method C-3094/ASTM D-882. Samples were 2 in. dumbbells with 0.125 in. neck and .030 in. sample thickness. Separation rate was 2 inches per minute.
Peel Strength Test Methods
Peel Strength Type Substrate Test Temperature Test Method
Excellent
20 piw 180° T-Peel Strength Etched Al/Etched Al -55°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.
35 piw 180° T-Peel Strength Etched Al/Etched Al 23°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.
35 piw 180° T-Peel Strength Etched Al/Etched Al 38°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.
36 piw 180° T-Peel Strength Etched Al/Etched Al 54°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.
35 piw 180° T-Peel Strength Etched Al/Etched Al 65°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.
34 piw 180° T-Peel Strength Etched Al/Etched Al 83°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.
16 piw 180° T-Peel Strength Neoprene/CRS 23°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.;Rubber delamination/tear.
4 piw 180° T-Peel Strength Nitrile/CRS 23°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.
17 piw 180° T-Peel Strength Red SBR/CRS 23°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.;Rubber delamination/tear.
3 piw 180° T-Peel Strength Black SBR/CRS 23°C Metal/metal bonds tested per 3M TM C-439 @ 20 in./min. at 73°F (23°C) substrate 0.020 in. thick. Metal/rubber bonds pulled at 10 in./min., Rubber/metal bonds. Rubber sanded with 120 grit sandpaper then MEK wiped.
Dielectric Constant Test Methods
Dielectric Constant Temperature Test Method
3.60 23°C ASTM D-150 at 73°F (23°C)., 500 Hz
3.60 23°C ASTM D-150 at 73°F (23°C)., 1 KHz
3.50 23°C ASTM D-150 at 73°F (23°C)., 10 KHz
3.40 23°C ASTM D-150 at 73°F (23°C)., 100 KHz
Dissipation Factor Test Methods
Dissipation Factor Temperature Test Method
0.04600 23°C ASTM D-150 at 73°F (23°C)., 500 Hz
0.03700 23°C ASTM D-150 at 73°F (23°C)., 1 KHz
0.02300 23°C ASTM D-150 at 73°F (23°C)., 10 KHz
0.01800 23°C ASTM D-150 at 73°F (23°C)., 100 kHz
Volume Resistivity Test Methods
Volume Resistivity Temp (°C) Test Method
1.1e14 (ohms/cm) 23°C ASTM D-257 at 73°F (23°C).
Dielectric Strength Test Methods
Dielectric Strength Temperature Test Method
Surface Resistivity Test Methods
Surface Resistivity Temperature Test Method
2.1e15 (ohms) 23°C ASTM D-257 at 73°F (23°C).
Elongation Test Methods
Elongation Test Method
30 % Tensile and Elongation. Used procedure in 3M Test Method C-3094/ASTM D-882. Samples were 2 in. dumbbells with 0.125 in. neck and .030 in. sample thickness. Separation rate was 2 inches per minute.
Shore D Hardness Test Methods
Shore D Hardness Shore Hardness Test Method
79 ASTM D-2240
Coefficient of Thermal Expansion (CTE) Test Methods
Coefficient of Thermal Expansion (CTE) CTE Temperature (°C) CTE Test Method
105e-6 (unit/unit /°C) 20 to 100°C Determined using Thermal Mechanical Analysis (TMA) and heating rate of 41°F (5°C) per minute. First heat values given.
Glass Transition Temp (Tg) Test Methods
Glass Transition Temp (Tg) Glass Transition Temperature (Tg) Test Method
60°C Determined using DSC and heating rate of 68°F (20°C) per minute.